Our fitter will need to fix to brick or plastered wall or any other permanent structure.
You have selected your Car Charging Point and you understand that it must be located within your designated off-street parking area.
The charge point should be no more than 10 meters from your consumer unit. If a longer distance is needed, there’s an additional charge per meter. Additionally, the cable route cannot exceed 6 feet above ground; if a higher route is required, an extra charge will apply.
We cannot run the cable under floorboards or through ducting/ceiling voids/wall voids, or if the floorboards have not been lifted. We can’t take responsibility for reinstating flooring or other building materials after the cable has been laid.
You understand the cable will be surface mounted and clipped directly back to the surface and it cannot form a potential trip hazard.
Your consumer unit must be protected by an RCD Type A and have a spare way for the charge point circuit. If it doesn't, don’t worry— We can install a dedicated EV board at a cost of £150 this will be a bidirectional RCBO protected and Surge protected.
If we are required to drill through walls, they are no thicker than 500mm.